Data center campus at dusk

We builddata centers.Next, their power.

TRINITY Group Construction has delivered 2.5 million square feet of data center space. Now we are developing the HydroThermal Reactor to power campuses on site.

About KiNRG

The building and the energy behind it, from one partner.

We deliver data centers for developers today. We are engineering a way to supply their tenants with electricity generated on site, independent of the grid.

TRINITY Group ConstructionBuilding mission critical facilities since 2002.
A KiNRG company since April 2026.
Completed multi-story data center with its generator yard
Data hall aisle before fit-out
2.5M sq ftof data centers built or managed
What we do

Built for the load.

From shell to raised floor, in new sites and live ones, on schedules the market sets.

Transmission lines crossing open desert at golden hour

Power where the data center stands.

We are looking at hot, dry sites in California, Arizona, New Mexico and Texas, where the Reactor's design works best.

The HydroThermal Reactor

Baseload power without combustion.

Water cools warm, dry air at the top of a tall tower. The cooled air falls, accelerates and drives turbines at the base. No fuel is burned and no rare earths are used.

200 MW
Design capacity per Reactor
8
Patents issued, 5 pending
36
Turbines in the base
2029
Target for commercial operations

Design figures are the company's own. No Reactor has been built at commercial scale yet.

KiNRG aerial rendering of a HydroThermal Reactor with data center buildings
Rooftop chiller plant on a completed data center
Behind the meter.To be built alongside the data center it serves, by the same team.
TRINITY Group Construction

Built at scale.

2.5M
Square feet of data centers built or managed
500K
Square feet under construction in three states and Egypt
52 MW
Critical load per building at Ward County, Texas
2002
Building in Northern Virginia since
Large construction site with steel framing and equipment
Featured project

Ward County, Texas.

Four existing structures of 53,245 sq ft each, converted into data centers of about 52 critical MW apiece.

  • January 2026Contract executed
  • Aug 1, 2026Building 1 substantial completion
  • Dec 22, 2026Building 2 milestone
  • Jan 24, 2027Buildings 3 and 4 milestone
  • March 2027Final completion, expected
News

Latest.

All news
Project updateAugust 1, 2026

Building 1 at Ward County, Texas reaches substantial completion

Press releaseApril 13, 2026

KiNRG acquires TRINITY Group Construction through stock purchase agreement

Project updateJanuary 2026

TRINITY signs contract to deliver four data center buildings in Ward County, Texas

Planning a data center campus?

Talk to the team that builds them, and is developing the power to run them.